From scenario to approved plan.

Demonstration scenario. Fictional data.
The rail line closes on day 13. By day 24 the forward site is out of barrier material.
- First-ranked option, median
- As planned, median
- 5th to 95th percentile
246 days
Barrier material at Pabradė, stock in days
One model sits behind every screen. It plays the operation's network forward through thousands of futures, each with its own closures, weather and incidents, and keeps the whole spread. With the first-ranked option, stock is back above one day on day 26. As planned, on day 27.
Every 24 hours the watch runs the released plan again.
Each cycle plays 500 futures. While the chance of a critical shortfall stays under the threshold, the watch stays quiet. When it crosses, the planner, the approver and the commander are told, and an option is ready for two approvals.
Chance of a critical shortfall
Threshold 5%
2.2%6%
0%10%
The watch stays quiet.
An option is ready for two approvals.
The platform imports SAP-format data and maps LOGFAS, exchanges APP-11 messages, exports NVG, links to exercises over C2SIM and HLA, and runs an FMN conformity self-check.
Symbols on the shared map, APP-6
- Armoured brigade
- Mechanised brigade
- Port
- Airfield
- Railhead
- Depot
- Forward site
- Digital twins
- Units, sites and fleets stay in step with every import, and their forecasts are graded against what happened.
- Your network
- On premises and air-gapped, with open-weight models on your own hardware.
- Access
- Smart-card sign-in, NATO security labels and need-to-know on every row.
- Release
- Two people approve every release. The audit trail goes to your SIEM.
- Briefings
- Every run as PPTX and PDF.
- Languages
- The app in English and German, the planner assistant also in French.